How many rounds of revisions are included

Two rounds at the design stage and one round after launch. On top of that you have 30 days after launch to report errors: these are defects and they do not count as revisions. The scope is written into the contract.

Unlimited revisions sound good in a proposal, but in practice they end in a project that drags on for months and serves nobody. A limited number of rounds forces concrete decisions.

A revision is a change to something that works but is meant to look or sound different. A defect is something that does not work as agreed: a form that does not send, a layout that breaks on a phone, a broken link. We fix defects reported within 30 days of launch without using up a round.

Small corrections after launch, such as a typo or a change of phone number, we usually do straight away and do not count as a round.